
Activity 3.1: Photo essay timeline
Prepare a 12 week shoot timeline with practical and achievable weekly targets.
| Week 1 | collating images from Para pride event her first Pride fair day |
| Week 2 | planning mardi gras images and event photography style |
| Week 3 | going through 900 images looking for the ones that encapsulate her experiance from Mardi Gras and pride fair day |
| Week 4 | interviewing friend who’s daughter also came out in the last few years who volunteered at Mardi Gras in Sydney |
| Week 5 | 1st studio shoot |
| Week 6 | 2nd Studio shoot |
| Week 7 | editing and refining images |
| Week 8 | culling images down to 15-25 images to tell our story |
| Week 9 | redoing any images that i feel could tell our story better |
| Week 10 | final edits and preparing for delivery to publication |
| Week 11 | backing up all files |
| Week 12 | presentation |
Activity 3.2: Photo essay DAM structure
Prepare DAM workflow structure for the essay with practical steps you will follow from image capture, download, backup, renaming, rating, editing, metadata and output
The Digital Asset Management strategy for this overall assignment will be in line with my normal 3 tiered DAM management for storage of files, and will incorporate , 2-3 Cloud storage sites ( 2 iCloud addresses and Dropbox) and a seagate external drive, mac hard drive for local file processing as well as SD card archives.
My workflow begins with Pitch to Publication, capture via Nikon DSLR/iPhone x , upload/preview in Lightroom, edit in Photo shop if required, export of edited files to BORN THIS WAY folder, back up folder in 3 tier storage. Layout, Presentation to Client.
Activity 3.3: Model Release
Prepare a model release for use in your project. Use the AIPP Model Release form as an example to guide you in developing your own release form:
